Case Study: Vertiv and Wiwynn (Johor Localization & Witness Testing)

1. Vertiv's Johor Manufacturing & Witness Testing Hub

  • Opened a new AI infrastructure plant in Johor and Batam Hub in July 2026 (ramping to full capacity by Q3 2027, creating up to 500 skilled jobs).

  • Manufactures CoolChip CDUs, Power Skids (cutting deployment time by 50%), and SmartRun prefabricated overhead busway + liquid cooling piping modules (cutting white-space installation time by 85%).

  • Crucial Differentiator: Built an on-site Customer Witness Testing Lab in Johor so regional buyers can verify full-load CDU and power skid performance before site delivery.

2. Wiwynn's Localized L10-L12 Server Integration

  • Built Phase I server rack integration (2023) and Phase II PCBA plants in Senai Airport City, Johor.

  • Acts as strategic Tier 2 - Server ODMs partner for YTL Power's 600 MW Kulai AI campus.